Summit Construction Materials

Projects

Summit Materials have been used in Local, State and Federal Government projects. We have worked with Mackay Airport, North Queensland Bulk Ports, CPB Contractors, Coal Terminals and Sugar Mills whilst at the same time catering for smaller projects like driveways and minor works. Some previous and current projects are listed below.

Mackay Ring Road

Summit was engaged by CPB Contractors to supply embankment fill, rock products and road base for Stage 1 of the Mackay Ring Road Project. This contract involves the supply of in excess of 1.5 million tonnes of materials, delivered at a rate of in excess of 11,000t/day, with materials coming from multiple quarries each day. Due to the large scale of the project we increased our fleet to include a diverse range of semi side tippers, end tippers and truck and dog combinations, allowing us to cater for any specific delivery requirement.

 

Hay Point Roundabout

Summit supplied Main Roads Certified material to the aggregate plant for the asphalt used for this project. Cement treated roadbase was supplied and a delivery schedule was arranged to ensure the correct amount of materials was supplied each day. A total of 68,000 tonnes of product were produced and delivered for this project.

 

Industroplex

Summit supplied this project with over 143,000 tonnes of material. Products included roadbase, drainage aggregate, crusher dust and more. Summit delivered all products to site to ensure that works were not delayed.

 

Bagasse Pad

Over 80,000 tonnes of material were produced and delivered for this project.

 

Forgan Bridge

Summit set up an on-site crushing operation to recycle the cement treated roadbase back into the project. Oversized rock 40mm-150mm and 2.5 roadbase was supplied for this project, complying with were Department of Transport Main Roads specifications. A total of 52,000 tonnes was supplied for this project.